Monday 25 April 2011

Easter finish it up weekend progress report...

I'm declaring 4 finishes this weekend.

Finish 1: skinny quilt for the BQL challenge. Techincally I finished this twice. I got it quilted and bound, then decided I really didn't like the way the setting triangles "bled" into the binding. There was no definiate edge to the on point blocks. I slept on it overnight and oddly dreamt how to tweak it. Next morning, I carefully took the binding off, appliqued the mauve strips over the egdes to look like a slim border, then re-applied the binding. much better!


Finishes 2 and 3 were mini Christmas table runners/counter covers.

I'd totally forgotten about these as they were over the top bannister with another UFO covering them! I thought about a Christmas bauble theme quilting, but, to be honest, I just wanted them finished and out of the UFO pile, so in the end I straight stitched in the centre of each strip in a selection of metallic threads. I bound each of them with some leftover binding from the sweetie jar, and machined in the ditch on the front to finish the binding off. Not my best work by a long way, but a kill's a kill.



Finish 4 had already been in a show, but I realised I wanted to add in the ditch quilting around each siggy square. This was the quilt which was hiding the Christmas runners on the bannister. I'd done all the in the ditching, just had to bury the ends...139 squares, one pass round each one, front and back thread...that's a lot of ends  to bury. I poured myself a big glass of wine, took a deep breath and just got on with it. It was done in two sessions, and the quilt is now folded and back inthe store cupboard. I bring it out to use as an example of a siggy quilt. My favourite thing about it, apart from the collection of signatures from around the world is the rainbow shading of the patches.


The final picture isn't a finish...yet. It's a trial to see how my planned quilting design will look on the Guide quilt. Cunningly, I also used two of my less favourite fat quarters...the orange top one is nothing compared to the multi-coloured monstrosity that lies beneath!


Tea break over, I'm about to start work on the Guide quilt...I've had best part of a month to do it, and need it for tomorrow evening! Just as well I'm off work, and apart from a blood test and returning a top to the shop, have a clear sewing day.

I'll report in on Wednesday on how I've done with it.

No comments: